April 16, 2026 09:49 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
‘We are surprised’: SC stays Pawan Khera’s bail over remarks on Himanta Biswa Sarma’s wife | Historic shift: Bihar gets first BJP CM as Samrat Choudhary takes oath | 'ECI deviated from Bihar procedure': Supreme Court raises concerns over voter deletion in Bengal SIR | Noida workers’ protest turns violent: Stones pelted, vehicles damaged over wage hike demand | Oil prices jump above $103 a barrel as US moves to block Iran-linked shipping | I don’t care if they come back or not, says Trump after Iran talks collapse | Legendary singer Asha Bhosle suffers cardiac arrest, hospitalised | Big boost to India–Mauritius ties: S. Jaishankar hands over 90 e-buses | Middle East tension: Iranian delegation arrives in Islamabad for major talks, 10,000 security personnel deployed | Ranveer Singh visits RSS HQ amid Dhurandhar 2 success, triggers speculation

One million tonnes hot metal produced till date by modern Blast Furnace "Kalyani" of SAIL-ISP

| | Sep 17, 2015, at 01:07 am
Burnpur, Sept 16 (IBNS): Within a year of its start, the new Blast Furnace "Kalyani" at IISCO Steel Plant touched the magical figure of producing 1 (one) million tons of hot metal on Wednesday.

The country's largest Blast Furnace that was “blown in” on 30 November last year has a useful volume of 4160 cubic meters, and can produce about 8000 tons of hot metal per day. It has been built by POSCO (Engineering and Construction), South Korea and NCC Ltd, India.

"The proud moment was witnessed by ED(F&A) Sudhir Kumar, EDi/c(Proj & SGW Kulti) R N Das, ED(MM) Himadri Bhattacharya, ED(Works) Rajesh K Rathi, ED(Proj) Arun K Rath, GM(Blast Furnace) Pawan K Singh, GM(Proj) G Vishwanadham and senior officials," read a statement issued byu the organization.

With an enhanced campaign life of 20 years, it is equipped with systems such as pulverized coal injection, cast house fume extraction, cast house slag granulation, high top pressure operation coupled with top pressure recovery turbine, twin material bin bell-less top, waste heat recovery and conveyor belt charging system.

It incorporates level II automation and has twin flat cast house with four tap holes.

The environment-friendly furnace ensures minimum emissions and recovers waste energy to the fullest; it also has a closed-loop cooling system resulting in almost zero water discharge.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.
Related Videos
RBI announces repo rate cut Jun 06, 2025, at 10:51 am
FM Nirmala Sitharaman presents Budget 2025 Feb 01, 2025, at 03:45 pm
Nirmala Sitharaman on Budget 2024 Jul 23, 2024, at 09:30 pm