December 24, 2024 10:03 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Five soldiers killed, several injured as Army truck falls into Poonch gorge | Allu Arjun quizzed by police in Pushpa 2 stampede case | Wanted Indian drug smuggler killed in the US | Congress leader files complaint against Allu Arjun for 'insulting police' in Pushpa 2: The Rule | Ahead of Jaishankar's US visit, foreign secretary Vikram Misri meets top US diplomats | India refrains from commenting on extradition request for ousted Bengladeshi PM Sheikh Hasina | I don't blame Allu Arjun, ready to withdraw case: Pushpa 2 stampede victim's husband | Indian New Wave Cinema Architect Shyam Benegal dies at age 90 | Cylinder blast at a temple in Karnataka's Hubbali injures nine people | Kuwait PM personally sees off Modi at airport as Indian premier concludes two-day trip
UNI

L&T Construction bags contracts for its various businesses

| @indiablooms | Jun 10, 2019, at 05:45 pm

Mumbai, Jun 10 (UNI) Larsen and Toubro L&T said that its Construction arm has secured orders from prestigious clients across various Indian states for its varied businesses.


The Water and Effluent Treatment business has secured a EPC order from the Delhi Jal Board for the design, construction, installation, automation, testing, commissioning and oam of a 477 MLD water

treatment plant (WTP), a 105 ML clear water reservoir and a pump house for the Chandrawal command area.

The project is a part of the Delhi Water Supply Improvement project (DWSIP) and is funded by Japan International Cooperation Agency (JICA). This win reaffirms the expertise of the business in the area of specialised treatment and water management, a statement said.

Another EPC order was bagged from the Rajkot Smart City Limited for design, construction, testing, commissioning and 0&M of infrastructure works for roads, drains, culverts, bridges, water supply, sewerage, street lighting and utility duct in the smart city area in Rajkot, Gujarat.

The residential business of Buildings and Factories business has secured a repeat order from a major developer in Bengaluru for the construction of a residential complex with a total built up area of 5 million sq ft.

An order has been received from a leading data centre developer for the construction of a TIER 3 data centre at Sipcot-Siruseri, Chennai. The project is to be completed within a stringent timeline of 16 months adhering to international standards of five commissioning levels. The factories business has secured an order

from a leading cement manufacturer for the construction of a cement plant in Kurnool, Andhra Pradesh.

The business has also secured an order from a vehicle manufacturing major for the development of a manufacturing facility in Pune.

The Transportation Infrastructure business has secured a engineering, procurement and construction order from the Delhi Aviation Fuel Facility Limited (DAFFL) for the execution of fuel hydrant system development works at the Indira Gandhi International Airport at New Delhi.

The scope of work includes design, engineering, procurement, supply, erection, installation, testing, commissioning, construction and successful completion of the T1 hydrant system works including 15 km

of pipelines with associated hydrant pits, valves, etc.

Another order has been secured from the Mumbai Metro Rail Corporation Ltd (MMRCL) involving design, procurement and supply, installation, testing and commissioning of ballastless track on the mainline from BKC station to Cuffe Parade (Package 10B - 43TKM) for Mumbai Metro Line 3 project (Colaba-Bandra-SEEPZ).

This order has been secured against stiff competition from other major multi-national companies.

Mumbai Metro Rail Corporation Limited (MMRC) is the nodal agency responsible for implementing the Mumbai Metro Line-3 (MML-3) project - a 33.5 Km long corridor between Colaba-Bandra SEEPZ that will be

funded by Japan International Cooperation Agency (JICA). This will be L&T's first project using Low Vibration Track technology like the one adopted for the line in the tunnel running under the English Channel connecting England a France.

This system is easier to maintain as compared to the conventional vibration mitigation methods used in ballastless tracks. The scope of work includes design, supply of fastening systems for the entire Line-3, supply

and installation of Low Vibration Ballastless tracks, testing and commissioning of ballastless tracks on the mainline from BKC station to Cuffe Parade station. The project has to be completed in 30 months.

 

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.