December 24, 2024 05:29 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
India refrains from commenting on extradition request for ousted Bengladeshi PM Sheikh Hasina | I don't blame Allu Arjun, ready to withdraw case: Pushpa 2 stampede victim's husband | Indian New Wave Cinema Architect Shyam Benegal dies at age 90 | Cylinder blast at a temple in Karnataka's Hubbali injures nine people | Kuwait PM personally sees off Modi at airport as Indian premier concludes two-day trip | Three pro-Khalistani terrorists, who attacked a police outpost in Gurdaspur, killed in an encounter | Who is Sriram Krishnan, an Indian-American picked by Donald Trump as US AI policy advisor? | Mohali building collapse: Death toll rises to 2, many feared trapped for 17 hours | 4-year-old killed after speeding car driven by a teen hits him in Mumbai | PM Modi attends opening ceremony of Arabian Gulf Cup in Kuwait

First consignment of SAIL-TMT rebars for Indo-Bangla Maitree project flagged off

| | Dec 20, 2017, at 11:12 pm

Kolkata, Dec 20 (IBNS): The Central Marketing Organisation (CMO) of Steel Authority of India Ltd (SAIL) this morning flagged off the first consignment of 1,000 tonnes of SAIL-TMT High Corrosion-Resistant (HCR) reinforcement bars for the prestigious Indo-Bangla ‘Maitree Super Thermal Power Project’ from Kolkata Port in a barge. 

The barge will offload the material at Bangladesh’s Mongla port, for transportation by road to the project site at Moidara village in Bagerhat district of Bangladesh.

The Maitree project is a 50:50 joint venture inked by Bangladesh Power Development Board and NTPC India for setting up of two 660 MW thermal power plants in Bagerhat district of Bangladesh by 2020 at an estimated cost of US$ 1.49 billion.

Responding to an enquiry floated by BHEL, which has been given the contract by the JV company Bangladesh-India Friendship Power Company (BIFPC) for engineering, procurement and construction work of the Maitree project, SAIL bagged an order for supply of 17,200 tonnes of corrosion-resistant thermo-mechanically treated (TMT) rebars in sizes 8mm to 36 mm in phase-1. Re-bars were produced at the three integrated steel plants of SAIL at Burnpur, Durgapur and Bhilai.

This is the first time that SAIL has utilised multimodal transport options for delivery of material to a project site.


The SAIL-TMT rebars were first transported from the steel plants via rail and road to SAIL’s Durgapur Warehouse for packaging, then brought to the Kolkata Port by road, and finally loaded on to the barge.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.