December 24, 2024 06:50 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Allu Arjun quizzed by police in Pushpa 2 stampede case | Wanted Indian drug smuggler killed in the US | Congress leader files complaint against Allu Arjun for 'insulting police' in Pushpa 2: The Rule | Ahead of Jaishankar's US visit, foreign secretary Vikram Misri meets top US diplomats | India refrains from commenting on extradition request for ousted Bengladeshi PM Sheikh Hasina | I don't blame Allu Arjun, ready to withdraw case: Pushpa 2 stampede victim's husband | Indian New Wave Cinema Architect Shyam Benegal dies at age 90 | Cylinder blast at a temple in Karnataka's Hubbali injures nine people | Kuwait PM personally sees off Modi at airport as Indian premier concludes two-day trip | Three pro-Khalistani terrorists, who attacked a police outpost in Gurdaspur, killed in an encounter

Cabinet approves setting up of over 5,000 MW of Grid-connected Solar PV Power Projects

| | Jan 20, 2016, at 11:31 pm
New Delhi, Jan 20 (IBNS) The Cabinet Committee on Economic Affairs, chaired by Prime Minister Narendra Modi, has given its approval for setting up over 5,000 MW of Grid-Connected Solar PV Power Projects on build, own and operate basis.

The work will be implemented by Solar Power Developers (SPDs) with Viability Gap Funding (VGF) under Batch-lV of Phase-ll of the Jawaharlal Nehru National Solar Mission (JNNSM).The total investments expected under this scheme is about Rs 30,000 crore.

"This would help in creating additional 5000 MW capacity of Grid-connected solar PV power generation projects in four trenches of each 1,250 MW capacity during four financial years viz. 2015-16, 2016-17, 2017-18 and 2018-19," read a government statement. 

"This would also help in employment generation of about 30,000 people in rural and urban areas with reduction of about 8.525 Million T of CO2 emissions into environment every year," it said.

"The tenders will be State-specific based on the demand from particular State.  States/Union Territories/Discoms/State Utilities are the beneficiaries. This will also facilitate to create employment and infrastructure in the States. Installation of 5000 MW Solar PV plants will generate about 8,300 Million units per year, which caters power to almost 2.5 Million households," it said.

The statement further said: "The estimated requirement of funds to provide VGF for 5,000 MW capacity solar projects is estimated to be Rs. 5,050 Crore (Rs 1.00 Cr / MW). This includes handling charges to Solar Energy Corporation of India (SECI)  @ 1% of the total grant disposed and Rs. 500 crore for payment security mechanism for all three VGF schemes of 750 MW, 2000 MW and 5000 MW."

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.