January 22, 2025 07:47 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Saif Ali Khan's attacker wanted to treat ailing mother in Bangladesh with the stolen money: Reports | US prioritises India as Secretary of State Marco Rubio picks Jaishankar for his maiden bilateral meeting | I don't want to stop, but also want competent people: Donald Trump on H-1B visa | QUAD leaders commit to strengthening free and open Indo-Pacific, send veiled message to China in first meeting after Trump's inauguration | At least two Maoists are eliminated by security forces every day: Centre | New US Secretary of State Marco Rubio to hold first bilateral talk with S Jaishankar | Saif Ali Khan is back home, waves at fans after hospital discharge | 66 killed as fire engulfs hotel at a ski resort in Turkey | At least 14 Maoists killed in encounter along Odisha-Chhattisgarh border, Amit Shah says 'mighty blow to Naxalism' | Donald Trump pulls US out of Paris agreement in a repeat of his 2017 move
PMGSY
Unsplash

J&K: Roads construction under PMGSY in Baramulla in full swing despite Covid-19

| @indiablooms | Aug 09, 2020, at 11:41 pm

Srinagar: Jammu and Kashmir seems to be benefiting from the Pradhan Mantri Gram Sadak Yojana (PMGSY) as the construction of a road under it is now gaining pace after a brief halt due to COVID-19 imposed lockdown.

The government has approved up-gradation of the 5.25-km road from NH1A 46th Delina to Singhpora in Baramulla and the work is being executed under PMGSY at the cost of Rs.443.65 lakhs, reports ANI news agency.

Tara Singh, Sarpanch, Singhpora told ANI that the road is being constructed using better-quality materials. 

Local residents are facing hardships due to the road condition.

"We were waiting for the construction of the road in our area for several years. This wish is being fulfilled. The engineering team and other workers are doing work with great dedication," Rajveer Singh, a local resident told ANI.

"The length of the road is 5.25 kilometres and the project is sanctioned for Rs 443 lakhs," Peer Shahjahan Muhammad, Executive Engineer, PMGSY Division Baramulla told the Indian news agency.

 

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.