April 17, 2026 01:33 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Bengal SIR: Supreme Court allows voters restored by tribunal till April 21 and 27 to vote | 'Women won't spare you': PM Modi warns Opposition over resistance to quota bill | Vijay booked in 3 cases over poll code violation ahead of Tamil Nadu polls | 'Black law': Stalin burns copy of 'delimitation' bill, slams Modi govt | TCS halts Nashik BPO operations amid sexual abuse, conversion allegations | ‘We are surprised’: SC stays Pawan Khera’s bail over remarks on Himanta Biswa Sarma’s wife | Historic shift: Bihar gets first BJP CM as Samrat Choudhary takes oath | 'ECI deviated from Bihar procedure': Supreme Court raises concerns over voter deletion in Bengal SIR | Noida workers’ protest turns violent: Stones pelted, vehicles damaged over wage hike demand | Oil prices jump above $103 a barrel as US moves to block Iran-linked shipping
The development comes as both countries prepare new loan framework to fund next-gen E10 trains. (Image courtesy: Pixabay)

Japan to gift Shinkansen trains for India’s bullet train trials, ahead of new loan pact

| @indiablooms | Apr 18, 2025, at 10:51 pm

New Delhi/ Tokyo: In a significant boost to India’s first bullet train project, Japan will donate two Shinkansen train sets to assist with testing and inspection of the Mumbai-Ahmedabad High-Speed Rail corridor, Japan Times has reported.

One E5 and one E3 series train will arrive in early 2026, each retrofitted with inspection equipment to assess operational challenges unique to Indian conditions, such as high temperatures and dust.

The data gathered from these test runs will help fine-tune the corridor’s systems and pave the way for the introduction of next-generation E10 trains, which are expected to be produced in India starting in the early 2030s.

Until then, modified semi-high-speed trains made domestically are expected to run on the corridor.

The Mumbai-Ahmedabad route marks a milestone in India’s infrastructure development, supported by Japan’s renowned Shinkansen technology.

The project is being funded predominantly through low-interest yen loans from the Japanese government, which cover about 80% of total costs.

With rising expenses, both governments are working to finalise a fresh loan framework to support the introduction of E10 trains, likely to be discussed during Prime Minister Narendra Modi’s upcoming visit to Japan for a bilateral summit.

The donated Shinkansen trains represent Japan’s engineering excellence.

The E5 is known for its speed and streamlined design, while the E3 series balances efficiency and passenger comfort.

Their deployment in India will generate vital insights into the track conditions and overall performance of the corridor.

Construction of the high-speed rail corridor, led by the National High-Speed Rail Corporation Limited (NHSRCL), has been progressing steadily since November 2021. So far, bridges have been built across six rivers in Gujarat as part of the 24 total river crossings along the route.

Highlighting the project's transformative potential, Union Railway Minister Ashwini Vaishnaw had earlier noted, “The bullet train project has to be seen from the perspective of integrating economies… You can have breakfast in Surat, complete your work in Mumbai, and return with your family by night.”

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.