May 18, 2026 02:23 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Kathak to Garba: Indian diaspora stuns PM Modi with grand welcome in Amsterdam | ‘Geography or history’: Indian Army chief issues blunt warning to Pakistan over terror support | India, UAE ink key energy deals during Modi’s visit amid West Asia tensions | ‘There can be no better Bengal CM’: Mithun Chakraborty praises Suvendu Adhikari | PM Modi adviser Sanjeev Sanyal frontrunner for Bengal Finance Minister: Report | FIR against Abhishek Banerjee over ‘provocative speeches’ during West Bengal poll campaign | Madhya Pradesh High Court holds Bhojshala complex disputed site to be a temple | ‘Even ex-CM can be probed’: Suvendu Adhikari’s big statement on RG Kar case | Big action in RG Kar case: Bengal CM Suvendu Adhikari suspends 3 IPS officers, including ex-CP Vineet Goyal | Modi’s UAE visit delivers major defence, energy deals amid Middle East tensions
ISRO
Image Cr: UNI

ISRO's gearing up for GSLV-F10/EOS-O3 mission on Aug 12

| @indiablooms | Aug 05, 2021, at 11:54 pm

Chennai/UNI: After a long gap, the Indian Space Research Organisation (ISRO) is gearing up for a GSLV mission from the spaceport of Sriharikota, about 100 km from here, on August 12 early morning.

ISRO sources said Thursday the Geosynchronous Satellite Launch Vehicle-F10 (GSLV-F10) will instigate Earth Observation Satellite, EOS-03 from the Second Launch Pad of Satish Dhawan Space Centre (SDSC) SHAR, Sriharikota.

The launch is tentatively scheduled at 0543 hrs on August 12, subject to weather conditions.

EOS-03 is a state-of-the-art agile Earth observation satellite that will be placed in a Geosynchronous Transfer Orbit by GSLV-F10. Subsequently, the satellite will reach the final geostationary orbit using its onboard propulsion systems.

A four-metre diameter Ogive shaped payload fairing is being flown for the first time in this GSLV flight.

This is the fourteenth flight of GSLV and the first flight for ISRO this year after several of its launch missions were hit by the COVID pandemic.

The 2,268 kg EOS-3 or the Geo Imaging Satellite-1 (GISAT-1), will be the country's first sky eye or earth observation satellite to be placed in geostationary orbit.

The satellite will keep a steady eye on the areas of interest (the satellite will move in sync with the rotation of the earth and hence would look stationary) unlike other remote sensing satellites placed in a lower orbit that can come to a spot only at regular intervals.

Originally the GISAT-1 was slated for launch on March five last year but was postponed a couple of hours before the launch due to a technical glitch.

Soon after the Covid-19 pandemic and the subsequent lockdown delayed the mission. The rocket had to be dismantled and cleaned up.

Subsequently, the GISAT-1 launch was slated for March this year, but due to problems in the satellite's battery side, the flight got delayed. With the replacement of the battery, the satellite and the rocket were being readied for the mission when the second COVID wave led to further delay.

However, the ISRO sources exuded confidence that the mission will take off smoothly on August 12.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.