December 24, 2024 04:30 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
India refrains from commenting on extradition request for ousted Bengladeshi PM Sheikh Hasina | I don't blame Allu Arjun, ready to withdraw case: Pushpa 2 stampede victim's husband | Indian New Wave Cinema Architect Shyam Benegal dies at age 90 | Cylinder blast at a temple in Karnataka's Hubbali injures nine people | Kuwait PM personally sees off Modi at airport as Indian premier concludes two-day trip | Three pro-Khalistani terrorists, who attacked a police outpost in Gurdaspur, killed in an encounter | Who is Sriram Krishnan, an Indian-American picked by Donald Trump as US AI policy advisor? | Mohali building collapse: Death toll rises to 2, many feared trapped for 17 hours | 4-year-old killed after speeding car driven by a teen hits him in Mumbai | PM Modi attends opening ceremony of Arabian Gulf Cup in Kuwait
Botswana Coal Mine | JSPL
Image Credit: Unsplash

JSPL's African arm to build Botswana coal mine next year

| @indiablooms | Nov 23, 2021, at 08:19 pm

Gaborone/IBNS: Indian industrial major Jindal Steel and Power Ltd (JSPL) will construct a coal mine in Botswana's Mmamabula coalfields in 2022 to cater to the export market and supply a planned coal-fired power plant, Reuters reported.

JSPL's African arm aims to produce 4.5 million tonnes of coal annually from the upcoming mine, the report said.

At a time when demand for a ban on coal-based power is growing, the southern African nation is giving impetus to developing their 212 billion tonnes of coal resources.

Earlier this year, Botswana had finalised Jindal Africa, Minergy Ltd, African Energy Resources Ltd and Maatla Resources in a tender to build a 300 MW coal-fired power plant in April.

At the recently held COP26 climate conference in Scotland's Glasgow, Botswana had agreed to a global commitment of cutting down the use of coal but later opted out of a pledge to stop issuing fresh coal mining licences.

India and China led an intervention just before the conclusion of the climate talks to request a change from coal "phase out" to a "phase down". 

Currently, three companies -- African Energy Resources, Jindal Africa and Minergy -- are in the race for the 300 MW coal-based power plant after Maatla Resources pulled out, a Reuters report said.

Australia's African Energy Resources, with plans to spin off its coal operations into an unlisted entity, is taking part in the bidding.

Minergy, which owns the country's only operating privately-owned coal mine, has also said it will go ahead with the bid, the Reuters report stated.

Botswana aims to raise renewable energy's share of its electricity to 18 percent from the current two percent over the next two decades, Reuters reported.

The landlocked African country's coal plant is their only planned fossil fuel-based power project, it added.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.