January 20, 2026 10:53 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Nitin Nabin becomes BJP’s youngest president ahead of key assembly polls, PM Modi calls him ‘my boss’ | Viral video scandal rocks Karnataka Police: DGP Ramachandra Rao suspended | Jolt to ECI over SIR! SC allows BLAs at hearing, questions 'logical discrepancy'; TMC declares 'BJP's game over' | Will dal disrupt diplomacy? US lawmakers urge Trump to act on India’s 30% pulse tariff | 'Pakistan deserves Operation Sindoor 2.0', says Baloch leader over Trump’s Gaza board invitation to Islamabad | From Malda to the nation: PM Modi unveils India’s Vande Bharat sleeper | War zone Beldanga: Highway blocked, reporters attacked in migrant death protests | Can a Nobel Peace Prize be given away? Committee breaks silence after Machado hands over medal to Trump | Europe scrambles troops to Greenland as Trump’s takeover push triggers Arctic power showdown | Nobel drama: Venezuelan leader presents Peace Prize to Trump
Pakistan
Photo Courtesy: Pixabay

Pakistan: NEPRA says Chinese power plants using inferior coal

| @indiablooms | Sep 23, 2023, at 12:49 am

The National Electric Power Regulatory Authority (Nepra), which is the power regulatory body of Pakistan, has exposed Chinese coal-fired power plants to using lower-quality imported coal.

According to reports, the plants had pledged to use coal with a calorific value of 6000 (CVs).

Not a single imported consignment meets the required standards and still they claim multi-billion rupees of capacity payments that are being collected from the public, reports The News International.

This revelation came to light during a public hearing conducted by Nepra on Thursday to review the existing mechanism, last revised in 2016, the newspaper reported.

Nepra Chairman Waseem Mukhtar headed the proceedings while the authority’s members including Mathar Niaz Rana (member Balochistan), Maqsood Anwar Khan (KP), Amina Ahmed (Punjab), and Rafique Ahmad Shaikh (Sindh) were in the presence.

It is important to mention that the coal-based current derated installed capacity is 6,777MW (foreign-funded on imported coal), with an outstanding capacity payment of a substantial Rs643 billion.

While citing documents, a Nepra member was quoted as saying by The News International, “Your documents say that you imported lower quality coal against what was promised in the agreements.”

Notably, the Sahiwal Coal Power Project, now known as Huaneng Shandong Ruyi (Pakistan) Energy (Limited), disclosed that it had imported multi-thousand tons of coal in July 2022 when prices were high, at a rate of Rs70000/ton ($380).

However, in response, the Nepra member said, "You claim capacity payment, but you don’t use costly coal.”

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.