May 01, 2026 02:23 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
‘Not necessary to humiliate me with arrest’: Pawan Khera to SC over remarks on Himanta Biswa Sarma’s wife | ‘Let’s not choose for people capable of choosing’: Supreme Court to Centre on teen pregnancy termination | I-PAC co-founder Vinesh Chandel gets bail after Bengal polls conclude | Exit Polls Give Bengal to BJP—But One Survey Begs to Differ | Big defence push: Rajnath Singh to hold high-stakes talks with Italy’s Defence Minister | “Voting without fear”: PM Modi hails record turnout in West Bengal polls | Mamata Banerjee trying to intimidate Hindu voters, alleges Suvendu Adhikari in Bhabanipur | Operation Sindoor boost: India is now fifth-largest military spender at USD 92.1 billion in 2025, Pakistan's spending is also up | ‘Got the guts?’ Derek O’Brien dares Modi to quit if Mamata Banerjee wins Bengal polls | ECI ‘harassing’ TMC, dancing to BJP’s tune: Mamata Banerjee in Bhabanipur

SER GM inaugurates third PIT line at Padmapukur and electronic interlocking system at Shalimar

| | Oct 13, 2015, at 05:09 am
Kolkata, Oct 12 (IBNS) The General Manager, South Eastern Railway (SER), Radhey Shyam, on Monday inaugurated the third PIT line with 26 coaches’ capacity at Padmapukur to enhance the maintenance capacity there in addition to two existing PIT lines of 26 coaches each.

This is an effort to accommodate more number of extra special trains for maintenance. During the current festive season with the introduction of 139 pairs of Puja Special Trains, demand for maintenance facilities has increased to a greater extent.

To provide better, cleaner and improved passenger services, South Eastern Railway has been taking various infrastructural developmental works at Shalimar and Santragachi areas.  Commissioning of this third PIT at Padmapukur is one of them.

Shyam also inaugurated the Electronic Interlocking System of Train Operation at Shalimar to replace traditional Hand-Lever Frame of Interlocking System of Train Operation.

To make train movement improved, safer and speedier this new system is introduced.

The introduction of this new electronic interlocking system will give a quantum leap in signalling movement from 25 to 91 signalling routes.  It will lead to centralized operations in place of earlier cabin system. The entire yard has been track circuited which enhanced safety.

The new system is provided with VDU (Visual Display Unit) too make train operations more convenient and user-friendly.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.