January 08, 2025 08:58 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Sheesh Mahal row: AAP leaders who were denied entry into CM's residence turn towards PM's house | Anna University sexual assault accused is a DMK supporter, not member: MK Stalin | Ajit Doval, Raja Dato discuss bilateral cooperation during India-Malaysia Security Dialogue | US President-elect Donald Trump threatens to use economic force to make Canada 51st US State, Justin Trudeau retorts sharply | Elon Musk raises concern on 'world population decline' including that of India, China | Indian-origin Anita Ananda might replace Justin Trudeau as Canadian PM | 'I won't bite': Kamala Harris tells Senator's husband as he refuses to shake hands with her | Centre announces memorial for Pranab Mukherjee, his daughter thanks PM Modi for 'gracious gesture' | Delhi assembly elections on Feb 5, results on Feb 8 | Allu Arjun visits boy injured during Pushpa 2 stampede in Hyderabad

PM Modi reviews key infrastructure projects, India climbs on ease of getting electricity index ladder

| @indiablooms | Aug 08, 2018, at 12:51 pm

New Delhi, Aug 8 (IBNS) :  Prime Minister Narendra Modi on Tuesday reviewed the progress of key infrastructure sectors of power, renewable energy, petroleum and natural gas, coal, and mining.

The review meeting, which lasted for over two hours, was attended by top officials from infrastructure-related Ministries, NITI Aayog, and PMO.

In course of the presentation made by CEO NITI Aayog, Amitabh Kant, it was noted that the installed power generation capacity in India has risen to 344 GigaWatts. India's energy deficit, which stood at over 4 per cent in 2014, has shrunk to less than 1 per cent in 2018. Significant capacity additions have been made in transmission lines, transformer capacity, and inter-regional transmission. India now ranks 26th in the World Bank's "Ease of Getting Electricity" Index, up from 99th in 2014.

Progress in household electrification under the SAUBHAGYA initiative was reviewed. Discussions also focused on last mile connectivity and distribution, in both urban and rural areas. In the new and renewable energy sector, cumulative installed capacity has nearly doubled, from 35.5 GigaWatts in 2013-14, to about 70 GigaWatts in 2017-18. In solar energy, installed capacity has increased from 2.6 GigaWatts to 22 GigaWatts in the same period. Officials expressed confidence that India is on track to comfortably achieve the Prime Minister's target of 175 GigaWatts renewable energy capacity by 2022.

The Prime Minister urged the officials to work towards ensuring that the benefits from the increase in solar energy capacity, reach the farmers, through appropriate interventions such as solar pumps, and user-friendly solar cooking solutions. In the petroleum and natural gas sector, it was noted that targets set under the Pradhan Mantri Ujjwala Yojana will be comfortably achieved in the current financial year. In the coal sector, discussions focused on further augmentation of production capacity.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.