May 15, 2026 10:24 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Madhya Pradesh High Court holds Bhojshala complex disputed site to be a temple | ‘Even ex-CM can be probed’: Suvendu Adhikari’s big statement on RG Kar case | Big action in RG Kar case: Bengal CM Suvendu Adhikari suspends 3 IPS officers, including ex-CP Vineet Goyal | Modi’s UAE visit delivers major defence, energy deals amid Middle East tensions | BRICS sideline: Jaishankar holds crucial talks with Iran as West Asia tensions | Suvendu Adhikari resigns as Nandigram MLA, keeps Bhabanipur seat | Modi’s UAE visit delivers major defence, energy deals amid Middle East tensions | NEET (UG) 2026 re-exam scheduled for June 21 amid massive 'paper leak' row | ECI announces third phase of SIR; Himachal, J&K, Ladakh excluded for now | Storm fury in Uttar Pradesh: Death toll rises to 89 as rain, gale-force winds leave trail of destruction

N.F. Railway eliminates all un-manned Level-crossing gates in Group – B route between Maldah and New Jalpaiguri

| @indiablooms | Apr 02, 2018, at 11:04 pm

Kolkata, Apr 2 (IBNS): N.F. Railway has achieved the target of elimination of all unmanned level crossing in group ‘B’ route on Mar 31, adhering to the target set by Railway board.

Railway routes are classified into various categories based on the future maximum permissible speed i.e. Group ‘A” with sanctioned speed of 160 km per hour, Group ‘B’ with sanctioned speed of 130 km per hour, Group ‘C’, Group ‘D’, Group ‘E’ etc. N.F. Railway has 230 kms of Group ‘B’ route between Malda Town and New Jalpaiguri in West Bengal, read a government statement.

There are 22 un-manned level crossings in this section, all of which have been eliminated, 21 of them by posting gateman and 1 by diversion.

Presence of un-manned level crossing is a major safety concern, that too in a high speed and high density traffic route.

Elimination of these 22 un-manned crossing has addressed this serious safety concern for the railway.

N.F. Railway, according to P.  Sarmah, the CPRO, has so far eliminated 229 un-manned level crossings during 2017-18.

All un-manned level crossing, in all routes of the railway are to be eliminated by Mar 31, 2019.

 

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.