April 22, 2025 10:41 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Woman found dead with throat slit, ankles severed in Rajasthan's Sawai Madhopur; sparks outrage | Pope Francis, first Latin-American head of Catholic church, dies at 88 | Murshidabad violence: Supreme Court slams petitioner over irresponsible averments in plea | Family of Murshidabad riots victims decline Mamata Banerjee's compensation | Narendra Modi to visit Saudi Arabia next week, deepening multi-faceted partnership on agenda | Trump says US will 'take a pass' on Russia-Ukraine peace talks if parties make it difficult | Andhra student dies in accident in US' Texas days before her graduation | Karnataka students allegedly forced to remove sacred threads at CET exam centre, sparks outrage | Bengal BJP leader Dilip Ghosh marries party colleague Rinku Majumdar in an intimate ceremony today | Narendra Modi, Elon Musk discuss Indo-US tech collaboration
Khari-Sumber Tunnel

Kashmir Rail project: Portion of Khari-Sumber tunnel completed after breakthrough

| @indiablooms | Jan 24, 2022, at 11:37 pm

Banihal/IBNS: A portion of the main tunnel under the Kashmir Rail project in the 110-kms long Banihal Katra railway track has been completed and connected Saturday at a breakthrough ceremony.

The 1,800-metres long railway tunnel between Kundan and Aarpinchala is part of the longest (about 13-kms) railway tunnel of the Indian railway and is under construction in the Khari-Sumber sector of Ramban district.

An official of IRCON International, while talking to Greater Kashmir, said the breakthrough of the main tunnel number T-49B between Kundan Adit and Aarpinchala in Khari tehsil was done successfully on Sunday.

“This part of the tunnel falls in the geological zone of Ramsoo formation which is prone to land-erosion," he said.

This formation has a Rock Mass Rating value between 15-25 and the tunnel is being constructed with the new Austrian tunneling method NATM.

“In this railway tunnel, 344M double track will be laid inside the tunnel as part of Aarpinchala yard,” he added.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.
Close menu