July 21, 2026 07:05 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
'Abhijeet Dipke has been picked up': CJP alleges police detained founder as Parliament march sparks chaos | Major twist in CJP protest: Abhijeet Dipke ends hunger strike | PM Modi calls for 'logic, not chaos' as stormy monsoon session opens amid CJP protest | Spain beat Argentina 1-0 in extra time to win FIFA World Cup 2026 | NEET protest escalates! CJP demands PM Modi's resignation after Sonam Wangchuk's forceful removal | Chaos at Jantar Mantar! Woman throws ink at CJP chief Abhijeet Dipke; he replies 'Blue is my colour' | A historic new frontier': PM Modi hails India's first private orbital rocket Vikram-1 launch | Mission Aagaman takes off: India's first private orbital rocket Vikram-1 makes history | NEET protest explodes: CJP founder Abhijeet Dipke begins indefinite hunger strike after Sonam Wangchuk's forceful removal | Jantar Mantar Protest: Cops remove Sonam Wangchuk from protest site, admitted to hospital
Khari-Sumber Tunnel

Kashmir Rail project: Portion of Khari-Sumber tunnel completed after breakthrough

| @indiablooms | Jan 24, 2022, at 11:37 pm

Banihal/IBNS: A portion of the main tunnel under the Kashmir Rail project in the 110-kms long Banihal Katra railway track has been completed and connected Saturday at a breakthrough ceremony.

The 1,800-metres long railway tunnel between Kundan and Aarpinchala is part of the longest (about 13-kms) railway tunnel of the Indian railway and is under construction in the Khari-Sumber sector of Ramban district.

An official of IRCON International, while talking to Greater Kashmir, said the breakthrough of the main tunnel number T-49B between Kundan Adit and Aarpinchala in Khari tehsil was done successfully on Sunday.

“This part of the tunnel falls in the geological zone of Ramsoo formation which is prone to land-erosion," he said.

This formation has a Rock Mass Rating value between 15-25 and the tunnel is being constructed with the new Austrian tunneling method NATM.

“In this railway tunnel, 344M double track will be laid inside the tunnel as part of Aarpinchala yard,” he added.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.