January 08, 2025 09:35 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Sheesh Mahal row: AAP leaders who were denied entry into CM's residence turn towards PM's house | Anna University sexual assault accused is a DMK supporter, not member: MK Stalin | Ajit Doval, Raja Dato discuss bilateral cooperation during India-Malaysia Security Dialogue | US President-elect Donald Trump threatens to use economic force to make Canada 51st US State, Justin Trudeau retorts sharply | Elon Musk raises concern on 'world population decline' including that of India, China | Indian-origin Anita Ananda might replace Justin Trudeau as Canadian PM | 'I won't bite': Kamala Harris tells Senator's husband as he refuses to shake hands with her | Centre announces memorial for Pranab Mukherjee, his daughter thanks PM Modi for 'gracious gesture' | Delhi assembly elections on Feb 5, results on Feb 8 | Allu Arjun visits boy injured during Pushpa 2 stampede in Hyderabad
Khari-Sumber Tunnel

Kashmir Rail project: Portion of Khari-Sumber tunnel completed after breakthrough

| @indiablooms | Jan 24, 2022, at 11:37 pm

Banihal/IBNS: A portion of the main tunnel under the Kashmir Rail project in the 110-kms long Banihal Katra railway track has been completed and connected Saturday at a breakthrough ceremony.

The 1,800-metres long railway tunnel between Kundan and Aarpinchala is part of the longest (about 13-kms) railway tunnel of the Indian railway and is under construction in the Khari-Sumber sector of Ramban district.

An official of IRCON International, while talking to Greater Kashmir, said the breakthrough of the main tunnel number T-49B between Kundan Adit and Aarpinchala in Khari tehsil was done successfully on Sunday.

“This part of the tunnel falls in the geological zone of Ramsoo formation which is prone to land-erosion," he said.

This formation has a Rock Mass Rating value between 15-25 and the tunnel is being constructed with the new Austrian tunneling method NATM.

“In this railway tunnel, 344M double track will be laid inside the tunnel as part of Aarpinchala yard,” he added.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.