December 15, 2025 09:22 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Centre moves to replace MGNREGA with 'G Ram G', sets stage for winter session showdown | Messi surrounded by VIPs, fans rage: Five held in stadium vandalism case | 'Messi was uncomfortable, lost his cool!': Ex-India footballer reveals what really happened at chaotic Kolkata stadium | PM Modi embarks on historic three-nation visit to Jordan, Ethiopia, and Oman | Caught in Thailand! Fugitive Goa nightclub owners detained after deadly fire kills 25 | After Putin’s blockbuster Delhi visit, Modi set to host German Chancellor Friedrich Merz in January | Delhi High Court slams govt, orders swift compensation as IndiGo crisis triggers fare shock and nationwide chaos | Amazon drops a massive $35 billion India bet! AI push, 1 million jobs and big plans revealed at Smbhav Summit | IndiGo’s ‘All OK’ claim falls apart! Govt slaps 10% flight cut after weeklong chaos | Centre finally aligns IndiGo flights with airline's operating ability, cuts its winter schedule by 5%

Cabinet approves upgradation and expansion of airport infrastructure at Lucknow, Chennai & Guwahati Airport

| @indiablooms | May 03, 2018, at 12:15 am

New Delhi, May 2 (IBNS): The Cabinet Committee on Economic Affairs, chaired by Prime Minister Narendra Modi on Wednesday given its approval to for expansion and upgradation of integrated terminals at Chennai, Guwahati & Lucknow Airports, at a cost of Rs.2467 crore, Rs.1383 crore and Rs.1232 crore, respectively.

Lucknow Airport: Construction of New Integrated Terminal will have an area of 88,000 sqm along with the existing terminal building with 16292 sqm and will have annual capacity to handle 2.6 million international and 11 million domestic passenger traffic. The new terminal building would cater to the requirement of passenger growth up to the year 2030-31.

Chennai Airport: Total built up area of the proposed terminal building, including the present proposal measuring 197000 sqm shall be 336000 sqm with an annual capacity to handle 35 mppa. The new terminal building incorporates green building features with an aim to achieve GRIHA-4 Star rating. The building would cater to the requirement of passenger growth up to the year 2026-27.

Guwahati Airport: The New Terminal Building shall have an area of 102500 sqm to handle combined annual capacity (old and new terminals) of 9 mppa. The building would cater to the requirement of passenger growth up to the year 2026-27. This will encourage investment & tourism in NER with thrust on ‘Act East’ Policy.

 

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.