August 14, 2026 11:13 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Ajit Doval breaks silence on Operation Sindoor in Discovery’s explosive new docuseries | Rahul Gandhi's 'mock hug' taunt sparks row; Centre stresses 'mutual respect' with Italy | Delhi on high alert: Bomb threat to High Court, airport and multiple locations ahead of I-Day | ‘Who are they to interfere?’: CJI Surya Kant slams Bar Council of India over NALSAR students’ enrolment row | 'Shows how low Congress has sunk': BJP slams Rahul Gandhi over Modi foreign policy jibe | From guns to glamour: Former women Maoists walk the ramp in Chhattisgarh | Netaji row: Suvendu Adhikari govt strips BJP MP Anant Maharaj of state honour | Sukhbir Badal attacked by Nihang Sikh with kirpan at Maharashtra gurdwara; assailant detained | ‘If you cannot do it, we will pass an order’: Supreme Court’s final warning to Centre on food labels | ‘Time to move on’: Bombay HC sends strong message in Vijay Mallya-bank dispute

Airports Authority of India to take up development work at Lucknow, Deoghar, Rajkot and Allahabad airports

| @indiablooms | Sep 19, 2017, at 12:40 am
New Delhi, Sept 18 (IBNS): The Airports Authority of India (AAI) will undertake new development works at Lucknow, Deoghar, Rajkot and Allahabad airports.

The objective is to improve and develop airport infrastructure to meet growing traffic demands.

AAI plans to construct new integrated passenger terminal building at Chaudhary Charan Singh International Airport, Lucknow at an estimated cost of Rs. 1230 crores. Passenger traffic at this airport has grown steadily during the last 5 years. The new terminal will be able to handle 4000 passengers during peak hour and 6.35 million passengers per annum, read the government statement.

"At Deoghar in Jharkhand, AAI will develop the airport to facilitate joint use for civil operation up to Airbus-320 and DRDO operation up to C-130 type of aircraft. The work will be carried out at an estimated cost of Rs. 401.34 crore on fixed cost basis and Rs. 427.43 crore on completion cost basis. An MoU was signed between the Govt. of Jharkhand, DRDO and AAI in March, 2017. As per the MOU, there will be financial input to the tune of Rs. 50 Cr by Govt. of Jharkhand, Rs. 200 Cr by DRDO and balance cost by AAI," the statement further said.

To meet the demand of increasing air travel in Allahabad, a new civil enclave at will be developed by AAI at an estimated cost of 125.76 crores. The new terminal is to be made operational before the ‘Ardh Kumbh Mela’ to be held in January 2019.

AAI will also take up the work of development of greenfield airport at Hirasar, Rajkot in Gujrat on Build, Operate and Maintain basis. Govt of Gujarat has provided the land free of cost and proposed the construction of the greenfield airport to meet the traffic potential of Saurashtra region, as indicated by its high level of economic growth.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.