April 01, 2026 07:17 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Bengal SIR progress: 47 lakh of 60 lakh adjudicated cases disposed of, Supreme Court informed | Amit Shah to join Suvendu Adhikari on Bhabanipur nomination day; BJP plans mega roadshow | Fuel prices rise: Premium petrol, diesel hiked amid oil price surge | Commercial LPG up Rs 195.50 as global oil prices rise; domestic rates unchanged | Layoff alert: Oracle cuts 30,000 jobs globally, 12,000 hit in India | ‘Unsubstantial allegations’: Calcutta HC dismisses plea on ECI’s officer transfers in Bengal | Tennis icon Leander Paes joins BJP ahead of Bengal polls | 8 killed, several injured in crowd crush at Bihar temple in Nalanda | Trump signals exit from Iran war even as Strait of Hormuz remains shut: Report | Mystery death in Pakistan: JeM chief Masood Azhar’s brother found dead

India's GSAT-18 Communication Satellite launched successfully

| | Oct 06, 2016, at 02:32 pm
New Delhi, Oct 6 (IBNS): India’s communication satellite GSAT-18 was launched successfully by the European Ariane 5 VA-231 launch Vehicle in the early morning hours of today (October 06, 2016). The 3404 kg GSAT-18 carries 48 communication transponders in C-band, upper extended C-band and Ku-band for providing various services to the country.

After a smooth countdown, the Ariane 5 launch vehicle lifted off right on schedule at 0200 hrs (2:00 am) IST today. After a flight of 32 minutes and 28 seconds, GSAT-18 separated from the Ariane 5 upper stage in an elliptical Geosynchronous Transfer Orbit (GTO) with a perigee (nearest point to Earth) of 251.7 km and an apogee (farthest point to Earth) of 35,888 km, inclined at an angle of 6 degree to the equator.

ISRO's Master Control Facility (MCF) at Hassan in Karnataka took over the command and control of GSAT-18 immediately after its separation from the launch vehicle. Preliminary health checks of the satellite revealed its normal health.

In the coming days, orbit raising manoeuvres will be performed to place GSAT-18 satellite in the Geostationary Orbit (36,000 km above the equator) by using the satellite’s propulsion system in steps.

After the completion of orbit raising operations, the two solar arrays and both the antenna reflectors of GSAT-18 will be deployed. 

Following this, the satellite will be put in its final orbital configuration.  GSAT-18 will be positioned at 74 deg East longitude in the geostationary orbit and will be co-located with the Indian operational geostationary satellites. Later, it is planned to experimentally turn on the communication payloads of GSAT-18.

After the successful completion of all the in-orbit tests, GSAT-18 will be ready for operational use.
 

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.