May 17, 2026 11:28 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Kathak to Garba: Indian diaspora stuns PM Modi with grand welcome in Amsterdam | ‘Geography or history’: Indian Army chief issues blunt warning to Pakistan over terror support | India, UAE ink key energy deals during Modi’s visit amid West Asia tensions | ‘There can be no better Bengal CM’: Mithun Chakraborty praises Suvendu Adhikari | PM Modi adviser Sanjeev Sanyal frontrunner for Bengal Finance Minister: Report | FIR against Abhishek Banerjee over ‘provocative speeches’ during West Bengal poll campaign | Madhya Pradesh High Court holds Bhojshala complex disputed site to be a temple | ‘Even ex-CM can be probed’: Suvendu Adhikari’s big statement on RG Kar case | Big action in RG Kar case: Bengal CM Suvendu Adhikari suspends 3 IPS officers, including ex-CP Vineet Goyal | Modi’s UAE visit delivers major defence, energy deals amid Middle East tensions

India preparing for GSLV-D6: Singh

| | Jul 24, 2014, at 03:20 am
New Delhi, July 23 (IBNS) Union Minister of State (Independent Charge) for Ministry of Science and Technology, M/o Earth Sciences, D/o Atomic Energy and D/o Space Jitendra Singh on Wednesday said the GSLV project has successfully launched GSLV-D5 flight with indigenous Cryogenic engine and stage on Jan 5 from Satish Dhawan Space Centre, Sriharikota and is currently preparing for the next flight GSLV namely, GSLV-D6.
"The GSLV-F02, GSLV-D3 and GSLV-F06 flights could not accomplish the mission objectives. Subsequently, failure analysis committees were formed to (a) carry out in-depth analysis of the flight performance and identify causes for the failure, and (b) recommend corrective measures and future course of action on the GSLV Vehicle. The failure analysis committees have submitted their recommendations," Singh said in a reply to a written question in the Lok Saha on Wednesday.  
 
He said, "Based on the suggestions made by the failure analysis committees, ISRO has implemented the modifications and improvements in GSLV, which include independent inspection and quality checks for all critical components and sub-assemblies, change of bearing housing material, revision of tolerances and seal clearances of Fuel Booster Turbo Pump of Cryogenic Engine, redesign of the Cryogenic Stage Lower Shroud, revision of connector mounting scheme and wire tunnel configuration."
 

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.