October 03, 2026 10:24 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Asian Games 2026: India beat Pakistan to clinch gold in men's cricket | flydubai cockpit attack: Deleted posts expose Omani co-pilot’s views on women, alleged extremist past | flydubai cockpit horror: Omani co-pilot Hamam al-Hammami attacked Captain Smit Machchhar with crash axe, tried to seize control | flydubai temporarily suspends all Israel flights after co-pilot’s alleged cockpit attack, crash attempt | Grounded in Oman over ‘radical views’, then hired by flydubai: What we know about Omani pilot Hamam al-Hammami | ‘Hanuman Chalisa gave me courage’: Smit Machchhar recounts flydubai cockpit battle to PM Modi | PM Modi speaks to Flydubai pilot Smit Machchhar who foiled crash plot, praises his courage | Putin praises Modi’s ‘good ideas’ to end Ukraine war, thanks Indian PM for peace efforts | Flydubai cockpit attack: Injured Indian pilot Smit Machchhar airlifted to Abu Dhabi | India backs brave flydubai pilot Smit Machchhar, Ambassador meets family after cockpit attack
L&T
Photo: PR Team

L&T Transportation Infrastructure Vertical secures twin contracts in Dubai. All details here

| @indiablooms | Sep 30, 2026, at 05:35 pm

The Transportation Infrastructure business vertical of L&T has formally executed twin contracts – one large* and one significant* – from the Roads and Transport Authority (RTA) of Dubai for the development of the Latifa Bint Hamdan Corridor.

The first contract involves the development of a new road connecting Al Khail Road with the extension of Latifa Bint Hamdan Street, along with the construction of bridges, tunnels and associated road works. This will enhance connectivity between Al Khail Road, Latifa Bint Hamdan Street and Al Meydan Street and improve access to nearby development areas.

The second contract entails the development of parts of Al Meydan Street, including the construction of a new interchange and associated at-grade roads to serve development projects in the area and improve traffic flow. The scope also includes the construction of a cycling track connecting it with the existing cycling network and contributing to an integrated route from Al Qudra to Jumeirah.

Both the projects are scheduled for completion by the end of 2028.Upon completion, the overall Latifa Bint Hamdan Corridor will extend approximately 12 km and strengthen connectivity between Dubai’s key road corridors, including Sheikh Zayed Road, Al Khail Road, Al Meydan Street, Sheikh Mohammed bin Zayed Road, Sheikh Zayed bin Hamdan Al Nahyan Street and Emirates Road.

The corridor is expected to accommodate around 16,000 vehicles per hour in both directions and more than 130,000 trips per day. It will also reduce travel time between Umm Al Sheif Street and Emirates Road from 33 minutes to 15 minutes.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.