April 16, 2026 10:20 pm (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Bengal SIR: Supreme Court allows voters restored by tribunal till April 21 and 27 to vote | 'Women won't spare you': PM Modi warns Opposition over resistance to quota bill | Vijay booked in 3 cases over poll code violation ahead of Tamil Nadu polls | 'Black law': Stalin burns copy of 'delimitation' bill, slams Modi govt | TCS halts Nashik BPO operations amid sexual abuse, conversion allegations | ‘We are surprised’: SC stays Pawan Khera’s bail over remarks on Himanta Biswa Sarma’s wife | Historic shift: Bihar gets first BJP CM as Samrat Choudhary takes oath | 'ECI deviated from Bihar procedure': Supreme Court raises concerns over voter deletion in Bengal SIR | Noida workers’ protest turns violent: Stones pelted, vehicles damaged over wage hike demand | Oil prices jump above $103 a barrel as US moves to block Iran-linked shipping
Image Credit: wikipedia.org

India ready to build mega Subansiri Lower hydropower project near China border

| @indiablooms | Jun 14, 2023, at 05:46 am

India is on the verge of commencing a large-scale hydropower project that has been under development for two decades, marking a major milestone in the nation's journey towards energy transition, media reports said.

NHPC Ltd., a government-owned hydropower company, is set to begin trial runs in July for the Subansiri Lower project located in the northeastern states of Assam and Arunachal Pradesh, close to the Chinese border, Bloomberg reported.

The project, which has faced huge delays due to protests and litigation over environmental concerns, is finally nearing completion.

The first unit is expected to be commissioned by December, and the remaining seven units will be operational by the end of 2024, as stated by Rajendra Prasad Goyal, the finance director of NHPC Ltd, the report said.

Hydropower plays a crucial role in balancing the grid, especially with the increasing generation of intermittent solar and wind power.

The cost of the Subansiri Lower project has surged to 212.5 billion rupees ($2.6 billion), exceeding the initial estimate by more than three times. The project faced a significant setback when it was suspended for eight years due to opposition and concerns regarding dams.

However, in 2019, the National Green Tribunal granted permission to resume the work.

The opposition to hydropower projects has restricted India's utilization of its vast hydropower potential, which is estimated to be around 145 gigawatts, with only a fraction of it being tapped so far.

“We need to get nearly 40 approvals from different departments before we start building a hydropower project. All the scrutiny should be done at this stage,” Goyal was quoted as saying by Bloomberg. “Any stoppages after the construction has begun are problematic.”

Large dams not only serve as a means of enhancing local economies in regions along India's tense borders with China and Pakistan but also contribute to the country's overall hydropower development.

With the Subansiri project nearing completion, NHPC is currently in the process of finalizing construction contracts for the ambitious Dibang project, which is set to be India's largest planned hydropower plant with a capacity of 2.9 gigawatts.

In order to promote hydropower generation, the government has designated large dams as clean energy sources. As a result, provincial power distributors are required to prioritize the purchase of hydropower over electricity generated from fossil fuels.

Further, the government has agreed to provide budgetary support for civil construction and flood moderation projects in certain cases.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.
Related Videos
RBI announces repo rate cut Jun 06, 2025, at 10:51 am
FM Nirmala Sitharaman presents Budget 2025 Feb 01, 2025, at 03:45 pm
Nirmala Sitharaman on Budget 2024 Jul 23, 2024, at 09:30 pm