October 04, 2026 05:22 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
Asian Games 2026: India beat Pakistan to clinch gold in men's cricket | flydubai cockpit attack: Deleted posts expose Omani co-pilot’s views on women, alleged extremist past | flydubai cockpit horror: Omani co-pilot Hamam al-Hammami attacked Captain Smit Machchhar with crash axe, tried to seize control | flydubai temporarily suspends all Israel flights after co-pilot’s alleged cockpit attack, crash attempt | Grounded in Oman over ‘radical views’, then hired by flydubai: What we know about Omani pilot Hamam al-Hammami | ‘Hanuman Chalisa gave me courage’: Smit Machchhar recounts flydubai cockpit battle to PM Modi | PM Modi speaks to Flydubai pilot Smit Machchhar who foiled crash plot, praises his courage | Putin praises Modi’s ‘good ideas’ to end Ukraine war, thanks Indian PM for peace efforts | Flydubai cockpit attack: Injured Indian pilot Smit Machchhar airlifted to Abu Dhabi | India backs brave flydubai pilot Smit Machchhar, Ambassador meets family after cockpit attack
Kolkata Metro
Photo: Kolkata Metro/Facebook

Faster than ever: Kolkata Metro’s Rs.671 Cr power upgrade to slash waiting time

| @indiablooms | May 02, 2026, at 05:58 pm

Indian Railways has sanctioned key infrastructure and capacity augmentation projects worth Rs. 895.30 crore to strengthen railway bridge infrastructure and enhance metro rail power systems.

Kolkata Metro Power System Augmentation

In a major step towards enhancing metro rail capacity, works worth Rs. 671.72 crore have been sanctioned for strengthening the North–South Corridor of Kolkata Metro Railway. This includes:

Provision of 07 new Traction Substations at a cost of Rs. 291.06 crore.

Augmentation and upgradation of Auxiliary Substation (ASS) & Traction Substation (TSS) systems from KESP (Esplanade Metro) to KMUK (Kavi Subhash – New Garia) for the North–South Corridor of Kolkata Metro Railway, along with augmentation of power supply at elevated sections from KNTJ (Netaji Metro Station) to KKVS (Kavi Subhash Metro Station), including enhancement from existing 11 KV system to 33 KV system, at a cost of Rs. 380.66 crore.

The Kolkata Metro system, built in the 1980s, was originally designed to support train operations at a frequency of about 5 minutes.

With rising passenger demand, the requirement for higher frequency operations has increased.

With the sanctioning of this project, Kolkata Metro will be enabled to operate at a 2.5-minute headway, significantly enhancing line capacity and service frequency.

The existing substations and equipment are reaching capacity limits and face maintenance challenges due to non-availability of spare parts.

The approved upgradation will ensure reliable power supply, support higher train frequency, and improve overall passenger service.

Bridge Infrastructure Strengthening in Adra Division

A project costing ₹223.58 crore has been approved for the construction of Bridge No. 520 UP & 520 DN (substructure) between MDKD–DMA (Madhukunda–Damodar) section, along with associated yard remodelling and track works in bridge approaches under South Eastern Railway.

The existing Damodar Bridge (Bridge No. 520), constructed in 1965 (UP line) and 1903 (DN line), has aged significantly and shows signs of structural distress, necessitating reconstruction of foundation and substructure.

This section is a key railway link between Asansol and Tatanagar, forming part of an important DFC feeder route and coal corridor (Sini–Purulia–Asansol), and carries a high traffic density of 67 GMT. The project will enhance safety, reliability, and operational efficiency.

The redevelopment is also expected to provide a boost to major industries in the Durgapur–Asansol belt, including IISCO plant, ACC plant and thermal power units, by improving rail connectivity.

Towards Modern, Safe and High-Capacity Rail Systems

These projects represent a significant step towards modernisation, safety enhancement, and capacity expansion across Indian Railways. While the bridge project will strengthen critical freight and industrial connectivity, the metro power upgrades will enable higher frequency, improved reliability, and better commuter experience in Kolkata.

Indian Railways continues to invest in robust infrastructure to meet growing transportation demands while ensuring safe, efficient, and future-ready rail operations.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.