December 24, 2024 08:25 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
India refrains from commenting on extradition request for ousted Bengladeshi PM Sheikh Hasina | I don't blame Allu Arjun, ready to withdraw case: Pushpa 2 stampede victim's husband | Indian New Wave Cinema Architect Shyam Benegal dies at age 90 | Cylinder blast at a temple in Karnataka's Hubbali injures nine people | Kuwait PM personally sees off Modi at airport as Indian premier concludes two-day trip | Three pro-Khalistani terrorists, who attacked a police outpost in Gurdaspur, killed in an encounter | Who is Sriram Krishnan, an Indian-American picked by Donald Trump as US AI policy advisor? | Mohali building collapse: Death toll rises to 2, many feared trapped for 17 hours | 4-year-old killed after speeding car driven by a teen hits him in Mumbai | PM Modi attends opening ceremony of Arabian Gulf Cup in Kuwait
Coal India
Image: Pixabay

Coal India Limited's coal output through opencast mines up 18.6 pc

| @indiablooms | Jan 16, 2023, at 11:46 pm

Kolkata: Coal India Limited's (CIL) composite production, the sum total of overburden removal (OBR) and coal output through opencast mines, went up by a sharp 18.6 percent to 1,439.6 million cubic metres (McuM) ending December FY’23, compared to the year-ago same period, CIL sources said on Monday.

This was 101 percent of the target achievement on progressive basis, they added.

The state-owned coal mining Maharatna excavated 1,154.2 McuM OBR till December of the current fiscal year, posting a 19.2 pc growth over a similar period last year and achieving 101 pc of the target.

CIL has also taken up manufacturing sand out of OB creating wealth from waste in an eco-friendly way. Presently, sand demand is met through sand mining and dredging from water courses of rivers which severely affects the ecosystem of rivers.

As an effort towards preserving the ecosystem, CIL has started an out-of-the-box initiative of segregating sand from overburden formations.

Three OB to sand conversion projects presently operated by CIL’s subsidiaries produced 16,643 CuM sand till Nov FY '23.

The company is unrolling plans to set up six more projects.

All nine plants aim to produce 30 Lakh CuM sand annually once fully operational.

This makes manufactured sand available at cheaper rates and in an eco-friendly manner. The move also helps improve the riverine ecosystem, they added.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.