December 24, 2024 02:00 am (IST)
Follow us:
facebook-white sharing button
twitter-white sharing button
instagram-white sharing button
youtube-white sharing button
India refrains from commenting on extradition request for ousted Bengladeshi PM Sheikh Hasina | I don't blame Allu Arjun, ready to withdraw case: Pushpa 2 stampede victim's husband | Indian New Wave Cinema Architect Shyam Benegal dies at age 90 | Cylinder blast at a temple in Karnataka's Hubbali injures nine people | Kuwait PM personally sees off Modi at airport as Indian premier concludes two-day trip | Three pro-Khalistani terrorists, who attacked a police outpost in Gurdaspur, killed in an encounter | Who is Sriram Krishnan, an Indian-American picked by Donald Trump as US AI policy advisor? | Mohali building collapse: Death toll rises to 2, many feared trapped for 17 hours | 4-year-old killed after speeding car driven by a teen hits him in Mumbai | PM Modi attends opening ceremony of Arabian Gulf Cup in Kuwait
Gurugram Metro
Representational image (Credit: Wikimedia Commons)

Cabinet approves metro connectivity from Gurugram's HUDA City Centre to Cyber City, with spur to Dwarka Expressway

| @indiablooms | Jun 08, 2023, at 05:32 am

New Delhi: The Union Cabinet on Wednesday approved a metro connectivity project from HUDA City Centre to Cyber City with spur to Dwarka Expressway, Gurugram covering a distance of 28.50 km having 27 stations on the route.

The total completion cost of the project will be Rs 5,452 crore.

This will be a standard gauge line of 1435 mm (5 ft 8.5 inches).  The entire project will be elevated.

The spur from Basai village has been provided for connectivity to the depot.

The project is proposed to be completed in four years from the date of sanction of the Project and is to be implemented by Haryana Mass Rapid Transport Corporation Limited (HMRTC) which will be set up as a 50:50 Special Purpose Vehicle (SPV) of the Government of India and Government of Haryana after sanction order is issued.

Commerce and Industry Minister Piyush Goyal said in a press conference that the project cost will be shared by the Centre and the state besides an international development assistance loan.

As of now, there is no metro line in Old Gurugram, but there are plans to establish one that would connect New Gurugram with Old Gurugram.

The 27 stations in this line are: HUDA City Centre – Sector 45 – Cyber Park – Sector 47 – Subhash Chowk – Sector 48 – Sector 72A – Hero Honda Chowk – Udyog Vihar Phase 6 – Sector 10 – Sector 37 – Basai Village – Sector 9 – Sector 7 – Sector 4 – Sector 5 – Ashok Vihar – Sector 3 – Bajghera Road – Palam Vihar Extension – Palam Vihar – Sector 23A – Sector 22 – Udyog Vihar Phase 4 – Udyog Vihar Phase 5 – Cyber City

The spur to Dwarka Expressway (Sector 101)

This proposed metro network is also expected to have a connection with the Indian Railway station. In its subsequent phase, the metro line aims to provide convenient connectivity to the Indira Gandhi International (IGI) airport.
The introduction of this metro line is anticipated to contribute to the overall economic development of the area.

Support Our Journalism

We cannot do without you.. your contribution supports unbiased journalism

IBNS is not driven by any ism- not wokeism, not racism, not skewed secularism, not hyper right-wing or left liberal ideals, nor by any hardline religious beliefs or hyper nationalism. We want to serve you good old objective news, as they are. We do not judge or preach. We let people decide for themselves. We only try to present factual and well-sourced news.

Support objective journalism for a small contribution.